Tuesday, July 9, 2013

Day 2--Firewall, Wing assembly, and rivets!

Hello everyone! Thanks for following along--we hope you're enjoying the pics from here in Arlington.  Let us know if you have any questions or would like to see something else in the blog, and we'll try to make it happen!

Today was another great day for learning, with more 'firsts' for each of us.  Today we learned how to use a Nico press to fasten cables, attach cables to bell cranks & pulleys, use pull rivets, drill carbon fiber, countersink holes for flush rivets, cut & bend fuel line pipes, and use swage locks.  The list goes on!  Here are some photos of the things we were working on today.

First, here are the guts of the right wing coming together:

This is one of the flap pulleys in the right wing.  Each wing has two flap cables--one to deploy the flap and the other to retract it.  The big cotter pin next to the pulleys keeps the cables seated in the groove.  The third cable sitting above the pulley is one of the aileron cables--the other one isn't installed yet.

This is the aileron "secondary" cable (the primary cable is in the cockpit--the secondary is in the wing; we will attach the two later).  It uses a similar type of pulley system.  The other aileron cable, the "crossover" cable, isn't installed yet in this photo but also goes through this pulley.  As its name suggest, the 'crossover' cable works from wing to wing in order to ensure symmetric aileron travel during flight.
This is the completed aileron cable assembly.  The cables go to a bellcrank which attaches to a pushrod (far right, protruding from the aft wing spar).  The pushrod actuates the aileron in flight.

This is a closeup of the cable fittings we use.  The clamp that looks like an oil drum is a Nico clamp.  We hand-pressed them with a Nico clamp, then put heat-shrink around the assembly to keep it clean and prevent wire frays at the end.  The Nico clamp actually creates a strong point in the cable, so it is extremely unlikely to fail.
Tracy and Ryan.  Tracy is hand-riveting the right aileron trim tab.

This is the completed right aileron trim tab.  Nice work, Tracy!  Note the inspection hole in the upper right of the photo...

...Inside the inspection hole is the electric motor that actuates the trim.  Our airplane has 2-axis electric trim (pitch and roll), so we will have a motor in the tail as well.

Our left wing already has the 'guts' in it required to rivet the top skins on, so we did about 85% of the rivet work on it this afternoon.
 
Left Wing ready to rivet.  The porcupine look is the Cleco clamps which act like removable rivets. The hole in the wing is a fuel filling port--there are two on each wing for our 4 total fuel tanks.

The rivets are covered with Rivet Tape, which serves to hold them in place and also helps keep the rivet gun from damaging the surface when it impacts.
This is the inside of the left wing looking from inboard.  On the left you can see the rivets prior to riveting--once riveted they are more flush.  About 3 feet down into the wing you can see the first spar with the lightening holes cut in it.  The first 3 feet of wing are empty right now but will eventually contain the primary left fuel tank.  Our tanks are welded aluminum and contribute to the wing's final structural makeup.

Finally, today we installed the Engine Firewall:


Tracy with Matt drilling firewall holes.

Tracy's tool is a 90deg drill--think "dentist drill."  It's used for tight spaces.  We tried to get a picture of Eric working inside the fuselage but there wasn't room for the camera...just kidding.

This is the interior side of the firewall, with insulation to reduce unwanted cabin heat from the engine.
This is the exterior of the firewall, with cleco clamps holding the firewall to the fuselage.

Eric is using a countersink cutting tool to sink the wells for the flush rivets to the exact depth.  Matt is holding a vacuum next to the process to keep down carbon fiber dust...which irritates skin and also can short out electrical circuitry if it accumulates.

This is a typical buzz of activity around the airplane...yep, that's how you do it in two weeks!

This is the near-complete firewall with the flush rivets in.  I only had to drill out one of them & redo...lucky.  The red seal you see is fire retardant caulk.

Three months preggers and building a plane--my wife is awesome.  But Tired!  See you tomorrow!

Monday, July 8, 2013

Day 1: Like kids in a candy store!

Day 1 complete, folks--and neither one of us can wipe the grins from our faces!  It was a whirlwind adventure, with both of us getting a lot of 'firsts.'  Some highlights:

--First hand riveting, pneumatic riveting, impact gun riveting, safety-wiring, torque-wrench use, cleco usage, castle nut/cotter pin bolt assembly, aluminum deburring....

Overall, we can say that the "Two Weeks to Taxi" program is exactly what we signed up for.  There are five Glasair employees--Ben, Mike, Bryce, Ryan, and Tyler--permanently assigned to putting our airplane together and gainfully employing us while doing it.  They are constantly working on various parts of the airplane and calling for our 'help' when it's time for us to learn about a section of the airplane, or a specific component.  Instead of trying to describe it, here's a string of pictures:
Completed Aircraft (from the last 2-week build period) in the hangar.  Our fuselage is about to go on the yellow stands in the back.

This is our personalized checklist of signoff items for the Two Weeks to Taxi build....

...this is the entire checklist!

Ben shows us the fuselage mold, on which a fiberglass fuselage half is currently setting.  Ours is carbon-fiber and is already done.  The fuselage is made of two layers or fiberglass (or carbon fiber) with a foam sandwich in between.

Our engine--a Superior Air Parts XP 400.  For the airplane buffs out there, it's a Lycoming IO-390 with a few nice adds, like roller lifters on the cam.  It puts out 215HP and burns roughly 10gp in cruise.

Tracy worked on the rudder pedals and brake system for a good part of the day.  This is the brake master cylinder.

These are the brakes prior to lines being added or any fittings torqued down.

This is the complete brake system, including the brake reservoir.  The bright orange dots on the fittings are torque seal--so you can inspect bolts to ensure they don't back out.

Day 1 and we fit the wings to the fuselage in order to set the dihedral.  Our airplane has a 2deg dihedral in the wings which makes it more stable.  After we set the dihedral, we drilled holes in the aluminum wing spars to fit the final bolts (Ryan is in the background setting the jig for the drill angle). We then took the wings back off for the rest of the work on them.  Hi Tracy!

The flap lever after assembly.  It actuates just like a hand-activated parking brake in a car...totally different function, though!

The left wing (after setting the dihedral) in its jig waiting for the fuel tanks to go in and final riveting.

The pitot tube viewed from inside the left wing.  The metal tube is for airflow to the airspeed indicator; the wires are for the pitot heat (in case of icing in inclement weather).

Tracy's first rivets--in the engine transducer bracket.  It will hold our engine oil and fuel transducers which will transmit engine readings to the cockpit.

Our wheels!  I never thought i'd be unpacking a wheel bearing and re-packing it today.  We did this to remove the shipping grease (keeps the wheel from corroding) and put in the working grease (helps it roll, baby!).  This was messy but only took about 20 minutes.  This is one of the great parts about owning an experimental--you are supposed to change the grease in these about every year at a minimum--like changing oil in our car.  If this were a certified airplane we'd need to pay somebody to do it.  We will just do it ourselves.

The vertical fin spar.  These are Eric's first rivets--woo-hoo!  The plate at the top is where the rudder attaches.
Okay folks, hope you enjoyed it.  More to come tomorrow!!
Cheers, Eric & Tracy

Sunday, July 7, 2013

Airplane Project, Day 0--the mundane, and homework!!











One of the mundane problems we had to solve coming out here is "where the heck are we going to live?"  Seems pretty easy at first, and there are some nice hotels in Arlington.  But at $100 per night for a month...well, the price of an airplane is suddenly going up!

Luckily, we got a military hook-up on this front.  Just 3 miles south of the Arlington airport (and our airplane factory) is a small Naval Outpost called Naval Station Everett.  It is a tiny, unguarded & ungated Navy facility with a couple of lodges, a Commissary, and a Navy Exchange.  We scored a suite at the "Navy Lodge Everett Smoky Point" for $60 per night...full kitchen and all!  The commissary is about 100 yards from us, and the Navy Exchange is fairly over-the-top--thing Super Target with military prices.  Anyone need a good deal on a flatscreen TV??

Anyway, for those interested here are some pictures of the mundane:
Front of our new home, the Navy Gateway Inn
Our outside "airplane building study area"

Our Suite little kitchen.

Tracy, already in study mode.  I am behind!
Now, back to the airplane!  We anticipate the build process to be fairly intense.  Beginning tomorrow, our daily routine will be building from 0700 to 1730.  The intro packet says "our workers (that's us) get a 10-minute break at 0900 and 1400, and a 30-minute lunch break from 1200 to 1230.  Thank goodness for the commissary--gotta bring grub!

The intro packet we have from the company goes fairly out of its way to remind us that the program is not for wusses!  I have attached a picture of tomorrow's tasks--actually, it's just page 1 of 4 of tomorrow's tasks!  All told, there are 102 tasks...which by my math equates to a task every 6 minutes.  Go!  Check out task #2 on the picture..."Mount Wings to Fuselage."  I can hear all the F-15 maintainers laughing at me right now...I can hardly wait to get going.
Page 1 of 4 of tomorrow's tasks.  Note task 2: "secure wings to fuselage."  Wow!
Speaking of which, time to go--got studying to do!









































































Monday, July 1, 2013

So it begins...the airplane project!

Thanks to all who are visiting our Blog to check out our airplane project.  This is the culmination of about a decade of saving and two years of serious planning for us.

For those who are new to the project, we have decided to build a Glastar Sportsman, which is a high-wing utility aircraft manufactured by Glasair Aviation in Arlington Washington.  It looks like this:

We decided to build this plane for a host of reasons:
--It performs very well (about 150mph with 4 people and luggage)
--It can get into and out of backcountry airfields with ease
--It is an "Experimental" category--which is much cheaper than buying a certified airplane like a Cessna
--It has a very impressive structural safety record (it is a composite fuselage around a steel roll cage, with aluminum flight surfaces)

But the biggest determining factor of all for us was the factory-sponsored "Two Weeks to Taxi" program, through which we can build our own airplane and have it flying in about 2-3 weeks.  This is the only way we could dream of building our own aircraft given our current work schedules.

If you are interested in the airplane or the Two Weeks to Taxi program, you can look here:
www.glasairaviation.com
If you would like to see a YouTube video of the Two Weeks to Taxi program, you can look here:
http://www.youtube.com/watch?v=UZWRlFa3nOw

Our adventure begins July 8th...we will try to update this page daily with posts so you can see how the build is going.  Wish us luck and stay tuned!

Sunday, August 5, 2012

Glacier National Park

Iceberg Lake from afar
Z&M at Iceberg Lake

Backpacking to Upper Two Medicine Lake

M on the trail
Our backcountry campsite at Upper Two Medicine Lake

Food thief

Z&M at Dawson Pass, above Upper Two Medicine Lake

Our favorite new animal- the hoary marmot

Camouflaged mountain goat

M hiking down from Dawson Pass against a phenomenal backdrop!

Next day's hike, up to Siyeh Pass.  Still a bit of snow in July!



Z&M at Siyeh Pass
Relaxing in style


 Eric is hungry for S'mores after a long day of hiking!!
 The morning view from our campground at Two Medicine Lake.  Does it get any more beautiful than that?




 Our favorite waterfall, on the trail to Upper Two Medicine Lake


One of the most amazing things about Glacier is all the riverbeds are made of pure rock, no mud or sand anywhere.  The water is crystal clear!


 Wide angle on Two Medicine Lake.


We are coming back later to collect this slab of granite and make a kitchen countertop out of it.


 The view from Highline Trail, near Logan Pass.  Someday we will backpack this trail into Canada...
Highline Trail


 Waterfalls below Logan Pass, from the Highline Trail


One type of trail obstacle...squirrels intent on eating the leaves hanging over the trail.  This little guy jumped twice his height to get that stem...while we stood there watching for about 90 seconds.




Preston Park, below Siyeh Pass.  One of the most beautiful meadows I've ever seen.  The snow has freshly melted and the first flowers are just peeking out on 26 July


 Wildflowers and baby pine trees in Preston Park
Zen at a quaint stream crossing

Our campsite on our last night, the back side of Lake McDonald
Zen's campfire artwork :)